One challenge was to design and engineer a gantry inside the container that was able to slide out 2.5 metres to collect the tender boat and store the tender whilst being shipped around the world. The gantry itself was engineered to lift 1 tonne of dead weight.
It is needless to say, the team in the SEA Containers workshop are proud of what was achieved. A lot of research and development went into this container, and the quality of the finish has only boosted our confidence in meeting the requirements of any client no matter the complexity of the design.
The comments from the yachts chief engineer was particularly welcomed:
"From initial contact right through to design, construction (and change of orders!), and delivery of our container, SEA Containers NZ did an excellent job of supplying us with an amazing product, finished to an extremely high standard and most importantly on time and on budget! We are extremely happy with the service we received and the level of quality in their product, I would use them again for future projects without hesitation." - Daz Neale, Chief Engineer
Comments
Post has no comments.